Multi-trade, 2.2MM workhours


  • 170,000 linear feet of pipe/195,000 inches of weld completed
  • 5,500 tons of steel erected
  • Over 100 separate pieces of equipment set; Dehydrators, Exchangers, Towers, Vessels, Pumps, Chiller Skids, Compressors, PDC’s, Transformers and Loading Arms
  • 403,000 feet of electric cable, 19,440 feet of conduit and 27,150 feet of cable tray
  • 297 Air tests completed – 1,333,724 CuFt of N2 used for testing
  • TAUC ZISA award for 2.2 Million Workhours @ MHIC without an OSHA Recordable Injury